GWR Route: Banbury to Wolverhampton
GWR Route: North Warwickshire Line
Birmingham Snow Hill - British Railways Period Locomotives:
gwrbsh2539
Ex-Great Western Railway 2-8-0 30xx (ROD) class locomotive
with a class H lamp headcode indicating an unfitted through freight train (see
'headcodes') approaching Snow Hill on the
up main line circa 1955. On the left is Birmingham Snow Hill North Signal Box,
which was built in 1910 with 224 levers operated electric point motors (one of
which can be seen in the foreground). This meant there was no requirement for
conventional point rodding or signal wires on this compact site (For details
see 'gwr/birminghamsnowhill.htm#electric').
In the middle of the First World War a simple heavy haulage
standard gauge locomotive was identified as a priority by the Railway Operating
Division (ROD) of the British Army in France. The locomotive design selected
was a 2-8-0 variant of the Great Central Railway's 8K class, designed by their
Chief Engineer JG Robinson. The UK Government ordered 518 locomotives of this
type to be built by five locomotive manufacturers; North British Locomotive
(NBL) Co Ltd (369), Robert Stephenson & Co Ltd (82), Nasmyth, Wilson &
Co Ltd (32), Kitson & Co Ltd (32) and Great Central Railway (4). They were
constructed between 1917 and 1919, but the war ended in November 1918 and by
the end of March 1919 only 305 had cross the channel for service on the
continent. In 1919, the Government declared them surplus and they were placed
up for sale.
The Great Western Railway purchased twenty of the newly
built 2-8-0 locomotives in 1919 and hired a further eighty-four, but these
hired locomotives were returned after a few years. By 1924 the UK Government
had only sold fifty locomotives and desperate to recoup some of their
expenditure they brought in George Cohen & Armstrong Whitworth Disposal
Corporation to sell the remaining locomotives at the highest price possible. At
£1,500 each, the Great Western Railway purchased eighty locomotives in
May 1925 under their lot 240. Many had of these had been standing idle for the
last five years and it was decided, after placing them in traffic for about
four months, to identify the best thirty locomotives, which would then be
overhauled under lot 241, while the remainder would be patched up, painted
black and run into the ground. The overhaul at Swindon Works, included
replacing the steel firebox with a copper firebox, removing the Westinghouse
brake apparatus, providing standard Swindon fittings and painting green.
The 30xx boiler operated at 185 lb and the locomotive had a
tractive effort at 85% of 32,200 lb, which meant it was classified in power
group D. The maximum axle weight of 17 tons, 7 cwt restricted the locomotives
to all main lines and some branch lines (route colour Blue). See 'misc_equip195' for more details. The
tenders purchased at the same time as the locomotive were allocated to GWR
tender lot A115. They could hold 4,000 gallons of water and had a 6 ton coal
capacity.
The 30xx class had a steam brake making them unable to
connect with fully fitted or partial fitted vacuum braked rolling stock, but
they found a role hauling heavy unfitted goods trains. Many were allocated to
South Wales sheds for the frequent long distance coal trains of private
owner wagons or to Banbury shed for the iron ore traffic. By the end of 1955,
seven of the first twenty purchased and thirteen of the second batch purchased
were still in service. The last three 30xx locomotives (No 3011, 3015 and 3024)
were not withdrawn until October 1958.
This photograph is displayed courtesy of the HMRS
(Historical Model Railway Society) and copies can be ordered directly from them
using the link HERE, quoting 'AEN134' part of the Ralph Lacey
collection.