|
|
|
|
GWR Route: Alcester to Hatton Junction
Claverdon Station: gwrc914
A new goods siding was constructed on the site of the
loading wharf with access at rail level. This allowed the old siding to be
removed prior to the construction of a new trackbed for the new down main line
as seen here on 17th January 1939. The middle open wagon is stopped directly
above the site of a future set of points, which would provide the goods siding
with a short head shunt. E Thomas had goods facilities at Claverdon for many
years and are believed to have owned several open wagons for use with coal
traffic. Their coal office can be seen here near the entrance to the goods yard
adjacent to the road bridge embankment.
Robert Ferris
back
|
|
|