GWR Route: Banbury to Wolverhampton
Moor Street Station: gwrms1723
The Shunter (Mr A Facey) at the controls of the electrically
powered 30 ton wagon hoist above Shed B warehouse. The cage can accommodate a
25 foot long wagon and travelling at the maximum speed of 137 feet per minute
can lift or lower a loaded wagon, the 33 feet, 4 inches between the rail level
in the high-level yard and that in the shed, in under 15 seconds. The lift was
made by Messrs S H Heywood & Company, with the three phase motors being
provided by the Lancashire Dynamo Company and the semi-automatic switchgear by
Messrs Electric Control Ltd.
Robert Ferris