A temporary pump installed beside a line of contractors temporary railway at Caves Inn, near Rugby

A temporary pump installed beside a line of contractors temporary railway at Caves Inn, near Rugby. Working to drive the pump beneath this somewhat ramshackle wooden shelter is a portable steam engine. The water seen exiting from the chute would have entered a ditch that would have been dug to the nearest stream or another place where the water could be discarded. A bridge can be seen in the background on the left indicating the contractor's temporary way was laid to the side of the excavation and the pump was lifting water from the bottom of the cutting. Note too the smartly dressed child posing with the navvy, and the bicycle propped against the timber frame.