|
|
|
|
Building the last Main Line Railway
Flecknoe, Willoughby and Staverton: gcrcs137
Built in advance of the embankment is a completed brick arch
occupation underbridge over a pathway. Built as part of Contract No 4 (Rugby to
Woodford) by T Oliver & Son to carry the London Extension across a farm
track in Warwickshire. On the far left of the picture are the first signs of
the embankment.
back
|
|
|