·  LMS  ·  GWR  ·  LNER  ·  Misc  ·  Stations  ·  What's New  ·  Video  ·  Guestbook  ·  About

Building the last Main Line Railway

Newton to the Oxford Canal: gcrcs95

A brick arch underbridge near the Oxford Canal at Rugby built to carry the Great Central over a stream

Built to carry the GC Main Line over a stream, this is a brick arch underbridge near the Oxford Canal at Rugby. This rough side of the embankment would later be dressed to form an even slope. T. Oliver & Son was the contractor employed to build this part of the London Extension (Contract No.4, Rugby to Woodford).

back