Birmingham New Street Station: lnwrbns_str1915
Looking towards Wolverhampton showing the erection of the
temporary roof above the West end of Platforms 2A and 3 in 1947. The steelwork
was obtained from the surplus stock of Air Raid Protection (ARP) steel held
during the Second World War for emergency repair or reconstruction of bomb
damage. The steel girders were covered with asbestos sheets with spaces above
the track to allow the smoke to escape. Richard Foster notes that the temporary
nature of the work meant that no attempt was made to embellish or improve the
aesthetic quality of the design. Needless to say the temporary austere canopies
became a permanent feature for nearly two decades until the rebuilding of the
station in the 1960s.