GWR Route: Hatton to Bearley and Alcester Branch
Junction
Aston Cantlow: gwrac793
A ground level view looking towards Great Alne showing Aston
Cantlow Halt's open framed timber construction on 18th May 1930. The Halt at
Aston Cantlow was authorised on 1st June 1922 and opened on Monday 18th
December 1922 at the same time as the section of the branch was reopened to
Great Alne. There were six trains each way on weekdays, but no permanent staff
allocated to Aston Cantlow and each day a porter from Great Alne travelled to
the halt to fill and trim the oil lamps on the platform.
Robert Ferris