|
|
|
|
GWR Routes: Banbury to Wolverhampton
GWR Routes: North Warwickshire Line
Bordesley Viaduct: gwrbg1715
The extension of the viaduct arch over Allison Street under
construction in September 1912. Each new brick arch was constructed on a wooden
forma, which supported the arch and would only be removed once the cement was
dry. The wooden forma here was supported on braced wooden pillars either side
of the roadway, so as not to interfere with traffic. The new entrances in to
the warehouse Sheds can be seen on the right.
Robert Ferris
back
|
|
|