|
|
|
|
GWR Route: Alcester to Hatton Junction
GWR Route: North Warwickshire Line
Bearley Junction: gwrbj790a
Close up of image 'gwr790' showing branch stop signal was
mounted on a concrete post, thought to have been installed prior to the
reopening of the Alcester branch in 1922. Several other signals on the Alcester
Branch are of a similar design. Railway companies experimented with
prefabricated concrete and steel lattice signal posts at this time because of
the lack of suitable imported Baltic timber during WW1 and immediately after.
Although wooden posts were reintroduced, the high price and inconsistent
quality resulted in trials of tubular steel signal posts in 1929 and five years
later tubular steel had become the official replacement for wood.
Robert Ferris
back
|
|
|