GWR Route: Banbury to Wolverhampton
GWR Route: North Warwickshire Line
Birmingham Snow Hill Station: gwrbsh1367
A view from the end of platform 6 of the northern approach
of Snow Hill Station, with the distinctive North Signal Box dominating the
scene. The limited space on the viaduct at this point dictated that this Signal
Box be positioned on braced steel stanchions. The North Signal Box opened on
31st October 1909 and was one of the first all electric signalling systems on
the Great Western Railway. It contained 224 levers operating; points as far as
243 yards and signals as far as 620 yards, from the Signal Box. The two lines
to the immediate left of the signal box were the relief lines, while to the
right was a short spur siding, the two main lines and the main loop line
respectively. On the far right was the New Yard Sidings and in the distance
Northwood Street Sidings where carriage stock was assembled.