|
|
|
|
GWR Route: Banbury to Wolverhampton
Leamington Spa Station: gwrls2075
View of the temporary booking office erected next to the
passenger under pass during the initial stages of rebuilding. The difference in
ground level between the Birmingham end of the station and the London end is
well illustrated in this view as the refreshment room, seen standing above the
excavated area, was built at the same ground level as the main entrance seen in
image 'gwrls2078'. On the right is a contractor's
timber site hut.
back
|
|
|