|
|
|
|
GWR Route: Banbury to Wolverhampton
Leamington Spa Station: gwrls2080
A 1936 view showing that the rebuilding of the station commenced
at the Birmingham end of the down platform. The four lines between the down and
up platform were by 1910 dedicated to through traffic whereas when first built
the two central lines were used to stable empty passenger stock. The central
portion of the train shed which had covered all four lines had been removed by
the late 1880s. The platforms were extended twice after opening, in 1886 when a
small extension was added to both platforms and again in 1901.
back
|
|
|