|
 |
 |
|
GWR Route: Banbury to Wolverhampton
Queens Head Yard: gwrqhy1966
Another view showing the spartan interior of Queens Head Signal
Box, with the telephone equipment on the back wall above the Signalmans
cupboard. Queens Head Signal Box opened on 19th December 1909. The Signal Box
utilised a spare secondhand timber cabin from Burrows Siding in South Wales.
The Burrows Siding Signal Box was a Great Western Railway standard type 27c
Signal Box, which had been built in 1905 to house a forty-one lever frame, but
by 1909 the trackwork layout there demanded a ninety lever frame and it was
decided to build a new larger signal box. The cast nameplate for Queens Head
Signal Box was ordered on 26th October 1909 (Order No264).
Queens Head Signal Box saw almost sixty years of service being
manned until March 1967. It was officially closed on 17th September 1972, but
the Signal Box had actually been dismantled before it was officially closed
with the structure being completely removed from site in the early Summer of
1972.
In the Appendix to the relevant Service Time Tables (STT) dated
March 1921 and March 1929 were the following instructions relating to Queens
Head Signal Box:
Local Engine Whistles for Queens Head Box: Up loop
to Main or Relief - Two crows Up Sidings to Main or Relief - Two crows, one
long Down Sidings to Down Relief - One long, two crows Up Goods having
traffic off at Hockley Yard - One crow Birmingham Corporation Siding at
Queens Head: This Siding is connected with the Up Shunting Spur at the
South end of Queens Head Yard by means of Hand Points, and must be worked under
the following regulations: The points are secured by a padlock, and, when
not in use, must be kept padlocked in their normal position for the straight
road. The key to the padlock must be kept in Queens Head Signal Box, and when
it is necessary to shunt wagons into or out of the siding the shunter must
obtain the key from the Signal Box, and when the work is completed secure the
points in their normal position and return the key to the Signal Box. Wagons
left in the siding must be secured inside the swing block, and the latter must
be locked across the rail and the key kept with the key of the
points. During the time the keys are out of the Signal Box the Signalman
must not lower the signal for any shunting to be done between Queens Head Yard
and the Shunting Spur. The times at which the keys are taken from and
returned to the Signal Box must be entered in the Train Register, and the
entries initialled by the Signalman and Shunter. The Siding must only be
shunted during daylight (P6174). Up Goods Loop Handsworth Station to
Queens Head: All trains must be stopped dead before entering this
loop.
With the Birmingham Corporation Destructor Siding
removed in March 1934 and the other trackwork at Queens Head rationalised, the
next STT appendix issued (dated April 1953) contained no specific local
instructions for Queens Head.
Robert Ferris
back

|
|
|