·  LMS  ·  GWR  ·  LNER  ·  Misc  ·  Stations  ·  What's New  ·  Video  ·  Guestbook  ·  About

Building the last Main Line Railway

Catesby Tunnel and Viaduct: gcrcs162

Eight labourers pose for the camera alongside another timber framed headgear erected over a shaft

Eight labourers pose for the camera alongside another timber framed headgear erected over a shaft. Piled on the makeshift loading stage beside the contractor's temporary rails, and waiting to be lowered to the army of men working below, are some of the thirty million bricks which were required for the tunnel's completion.

back