View of New Street station's centre lantern light and
ventilation section being removed in 1945. This was the first phase of the
removal of Cowper's great roof after the decision that the cost of reinstating
the roof to its original condition was too great. At the commencement of the
Second World War the roof had been covered with a layer of hessian and tar to
prevent light from being seen by enemy bombers and also to injury to staff and
passengers from flying glass if the station was bombed. The removal of the roof
also triggered the removal of New Street No 3 Signal Cabin as this would be
open to the elements. Its removal required the installation of track circuitry
and re-signalling including in the use of colour light signals. In the view
above No 3 Signal Cabin has been provided with a temporary roof to protect the
signalmen from the open elements until the re-signalling allowed its
removal.