Birmingham New Street Station: lnwrbns_str2948
Willesden Steam Breakdown Crane is seen assisting in the
demolition of the MR side of New Street station in 1965. Above its jib is the
temporary footbridge installed during the rebuilding of New Street. The
partially demolished New Street No 4 Signal Cabin, which was positioned between
Platforms 8 and 9, is visible above Platform 9 on the right.
back

|