·  LMS  ·  GWR  ·  LNER  ·  Misc  ·  Stations  ·  What's New  ·  Video  ·  Guestbook  ·  About

LMS Route: Rugby to Wolverhampton
LMS Route: Nuneaton to Leamington

Coventry Station: lnwrcov595b

Close up showing Coventry No 1 signal cabin which was the second to built at the southern end of the station

Close up of image 'lnwrcov595' showing Coventry No 1 signal cabin which was the second to built at the southern end of the station. The small extension at the top of the steps was a chemical toilet. The first signal cabin was built nearly opposite to its replacement, at the Rugby end of platform 1, replaced when the station was modified in the 1880s. Coventry No 1 had less than a year left in service before it was made redundant by the new Power Box.

back