![]() |
|||||
Rugby No 2 signal cabin's track diagram showing the down platform and down through lines plus sidings 4, 4A, 5 and 6. Colour light signalling is used on the through lines whilst upper quadrant semaphore signals were used to control access to the sidings. |
|