LMS Route: Stratford Midland Junction - The Shakespeare
Route
E&WJR and SMJ - Locomotives and Rolling Stock:
smjsa328
Former E&WJR 0-6-0ST No 1, now seen in Rother Vale
Colliery livery and numbered 0, is in near original form. Built by Beyer
Peacock to work the Stratford upon Avon to Broom Junction line, it was sold
1888 to Rother Vale Colliery. Apart from the fitting of a new firebox, tubes
and chimney in 1910 no other changes were made to outwardly distiguish it from
its original condition. The wheelbase was 13ft 9in with 48 inch diameter
wheels; working pressure was 120Ibs per sq inch; whilst the cylinders were 16
inch diameter with a 22inch stroke. Its water capacity was 700 gallons and it
weighed some 30 tons.
back
![](../railpics/invisible.gif) |