LMS Route: Nuneaton to Leamington
Bedworth Station: lnwrb3259
An overgrown and abandoned Bedworth station is seen on 13th
June 1966 some eighteen months after closure. Considering the the station has
been closed for over a year there is very little evidence of vandalism. The
large diameter glazed clay pipes on the platform indicate that there will be
some engineering work being undertaken soon with drainage along the track being
one of the priorities. The large board fixed to the end gable of the up
platform building (as seen in image 'lnwrb28') has
been removed and lowered to the ground.
back
|