LNER Stations

Building the last Main Line Railway

Catesby Tunnel and Viaduct

Additional pages divided on different thematic subjects are available by clicking on the links below:

Newton to Oxford Canal (21) Great Central Bridge and Viaduct (12) Rugby to Barby (23)
Catesby Tunnel and Viaduct (31) Flecknoe, Willoughby and Staverton (28) Contractor's Yards & Locomotives (16)

View of Catesby tunnel's southern portal which had still to be completed after the tunnel lining was complete
Ref: gcrcs161
Railway Archive
View of Catesby tunnel's southern portal which had still to be completed after the tunnel lining was complete
View of Catesby tunnel's northern portal which also needed to be added after the tunnel lining was complete
Ref: gcrcs80
Railway Archive
View of Catesby tunnel's northern portal which also needed to be added after the tunnel lining was complete
Looking along the contractor's temporary track towards the northern end of Catesby tunnel
Ref: gcrcs81
Railway Archive
Looking along the contractor's temporary track towards the northern end of Catesby tunnel
Looking along the contractor's temporary track towards the near completed southern portal of Catesby tunne
Ref: gcrcs153
Railway Archive
Looking along the contractor's temporary track towards the near completed southern portal of Catesby tunnel
View of the northern portal of Catesby tunnel and the poorly laid contractor's temporary track in August 1896
Ref: gcrcs186
Railway Archive
View of the northern portal of Catesby tunnel and the poorly laid contractor's temporary track in August 1896

View of the cutting being widened by steam shovel at the northern portal of Catesby tunnel
Ref: gcrcs155
Railway Archive
View of the cutting being widened by steam shovel at the northern portal of Catesby tunnel
View of the Great Central's newly laid permanent way and the completed south portal of Catesby tunnel
Ref: gcrcs174
Railway Archive
View of the Great Central's newly laid permanent way and the completed south portal of Catesby tunnel
View of the northern portal of Catesby tunnel and the Permanent Way hut being built on the left
Ref: gcrcs79
Railway Archive
View of the northern portal of Catesby tunnel and the Permanent Way hut being built on the left
Looking north along the inside of the northern section of Catesby tunnel to the mouth of the portal
Ref: gcrcs76
Railway Archived
Looking north along the inside of the northern section of Catesby tunnel to the mouth of the portal
View of the timber framed headgear used to ferry men and materials up and down shaft No 7 of Catesby tunnel
Ref: gcrcs88
Railway Archive
View of the timber framed headgear used to ferry men and materials up and down shaft No 7 of Catesby tunnel

View of three labourers and a boy labourer preparing to descend down one of Catesby tunnel's shafts
Ref: gcrcs78
Railway Archive
View of three labourers and a boy labourer preparing to descend down one of Catesby tunnel's shafts
Another steam powered derrick being deployed in the construction of Catesby tunnel, circa 1897
Ref: gcrcs75
Railway Archive
Another steam powered derrick being deployed in the construction of Catesby tunnel, circa 1897
View of the heavy timber framed headgear sited at the top of Catesby Tunnel's shaft No 8
Ref: gcrcs148
Railway Archive
View of the heavy timber framed headgear sited at the top of Catesby Tunnel's shaft No 8
View of one of Catesby tunnel's shafts employing a simpler type of headgear to gain access to the tunnel
Ref: gcrcs150
Railway Archive
View of one of Catesby tunnel's shafts employing a simpler type of headgear to gain access to the tunnel
Another type of headgear employed above a shaft in order to extract soil as well as lower materials and men
Ref: gcrcs151
Railway Archive
Another type of headgear employed above a shaft in order to extract soil as well as lower materials and men

Eight labourers pose for the camera alongside another timber framed headgear erected over a shaft
Ref: gcrcs162
Railway Archive
Eight labourers pose for the camera alongside another timber framed headgear erected over a shaft
Looking down from the top of a spoil heap towards a section of circular timber shaft formwork
Ref: gcrcs165
Railway Archive
Looking down from the top of a spoil heap towards a section of circular timber shaft formwork
View of one of the large square head frame used during the construction of the Catesby tunnel
Ref: gcrcs159
Railway Archive
View of one of the large square head frame used during the construction of the Catesby tunnel
View of the timber head gear and winding cable employed during the sinking of Pit Shaft No 7
Ref: gcrcs182
Railway Archive
View of the timber head gear and winding cable employed during the sinking of Pit Shaft No 7
View of the 'first tunnel shaft' taken in 1896 showing the method of disposing of spoil from the tunnel
Ref: gcrcs180
Railway Archive
View of the 'first tunnel shaft' taken in 1896 showing the method of disposing of spoil from the tunnel

View up the slope towards the precarious looking head gear that lay at the top of tunnel No 9
Ref: gcrcs191
Railway Archive
View up the slope towards the precarious looking head gear that lay at the top of tunnel No 9
View of Shaft No 4 during the construction of Catesby tunnel showing the headgear and other related structures
Ref: gcrcs185
Railway Archive
View of Shaft No 4 during the construction of Catesby tunnel showing the headgear and other related structures
View of the headgear and loading wharf employed at Shaft No 6 at Catesby tunnel during its construction
Ref: gcrcs190
Railway Archive
View of the headgear and loading wharf employed at Shaft No 6 at Catesby tunnel during its construction
A panoramic view of the building of the twelve arch Catesby viaduct  during its construction
Ref: gcrcs164
Railway Archive
A panoramic view of the building of the twelve arch Catesby viaduct during its construction
Looking across the valley and the River Leam along the line of Catesby viaduct as the brick piers start to rise
Ref: gcrcs166
Railway Archive
Looking across the valley and the River Leam along the line of Catesby viaduct as the brick piers start to rise

View of one of the ventilation shafts employed to disperse the steam and smoke from Catesby tunnel
Ref: gcrcs122
Railway Archive
View of one of the ventilation shafts employed to disperse the steam and smoke from Catesby tunnel
View looking north alongside several of the thirteen piers being built to form the twelve arch Catesby viaduct
Ref: gcrcs163
Railway Archive
View looking north alongside several of the thirteen piers being built to form the twelve arch Catesby viaduct
Looking north from the rising ground above Catesby tunnel's portal along the course of the GC's Main Line
Ref: gcrcs160
Railway Archive
Looking north from the rising ground above Catesby tunnel's portal along the course of the GC's Main Line
View of the 'Survey Station' erected by the contractor above Catesby tunnel to aid its construction
Ref: gcrcs189
Railway Archive
View of the 'Survey Station' erected by the contractor above Catesby tunnel to aid its construction
View of the Navvy hut settlement erected at Catesby to house the men building Catesby tunnel and viaduct
Ref: gcrcs187
Railway Archive
View of the Navvy hut settlement erected at Catesby to house the men building Catesby tunnel and viaduct

View of a brick arch overbridge spanning the GC line to London being built north of Catesby tunnel
Ref: gcrcs77
Railway Archive
View of a brick arch overbridge spanning the GC line to London being built north of Catesby tunnel